Red Sulphur Public Service District

  • Final Price: $10.9 million
  • Location: Monroe County, WV
  • Duration: since 1988
  • Purpose: Provide safe, reliable water for the citizens of Monroe County

Ballard Water Service Extension & Upgrade
The project consists of constructing 17,000 lf of 8" water mains with valves, hydrants and meters, 150 gpm booster station and controls to upgrade the existing water system and to serve 185 existing households.

Lindside Valley Water Service Area
This design extended service to 200 additional customers with 42,200 lf of water line and a 150,000 gallon storage tank.

Dry Pond - Pine Grove Water Service Area
Project consisted of 57,800 lf of 10", 8' & 6" water main lines with valves, hydrants, and meters; a 150,000 gallon water tank to improve existing customer flow and provide service to new customers and the development of additional raw water sources for 189 customers and future expansions.

Bozoo - Rock Camp Water Service Area
Project consisted of 100,475 lf of water main lines with valves, hydrants, and meters; a 100,000 gallon water storage tank, and water plant improvements to provide service to approximately 206 households.

Greenville Water Service Area
Project design consists of 65,800 lf of water main lines with valves, hydrants, and meters, 75 gpm water booster station, a 125,000 gallon water storage tank and raw water (well) source development.