Bridges

Montcalm Bridge

Rt 71 over Bluestone River
Mercer County, WV

Superstructure: curved plate girders and composite slab.
Substructure: integral cantilever abutments.
Span: 135' Completed: 2003

Project involved plans for replacing an existing bridge with alignment adjustments, bridge demolition, storm drainage, maintenance of traffic, and roadway & bridge designs.


Hemphill Overhead Bridge

County Route 70 over
Norfolk - Southern Railroad
McDowell County, WV

Superstructure: simple span, prestressed concrete box beam
Substructure: concrete founded on steel piling. Span: 73'
Completed: 1994

Project involved the development of contract plans and documents for the widening of the existing roadway approach with minor alignment adjustments, a pile & lagging retaining wall & fence, replacement of a deficient bridge over Norfolk Southern Railroad, utility relocation, storm drainage, an elaborate maintenance of traffic scheme with temporary traffic signals, roadway & bridge designs.


Lynn Camp Bridge

Over Hugh's Fork
Ritchie County, WV

Structure: prestressed box beams founded on steel piling and hammerhead pier.
Span: Two 70' (140' total)
Completed: 1993

The project involved the reconstruction of an existing road on a relocated alignment, replacing a deficient bridge, and a revised intersection with a county route.


Pointlick Bridge #2

County Route 73/5 over
Pointlick Fork
Kanawha County, WV

Superstructure: simple span, prestressed concrete box beams
Substructure: integral abutment founded on steel piling.
Span: 38' Completed:1996

The project included the widening of the existing roadway approach with minor adjustments, while replacing a deficient bridge, storm drainage, traffic control devices, relocation of parking lot for mobile home community, utility relocation, roadway & bridge designs. The staging of the construction scheme involved a temporary detour road and bridge.


Poplar Fork Bridge

County Route 40
Over Hugh's Fork
Putnam County, WV

Superstructure: simple span, prestressed concrete box beam
Substructure: concrete founded on steel piling.
Span: 70' Completed:1993

The project involved the reconstruction of the existing roadway approach on a relocated alignment, replacing a deficient bridge, and a revised intersection with County Route 13.


River Road Bridge

County Route 8 over
Mill Run, near Romney,
Hampshire County, WV

Superstructure: adjacent box beam
Substructure: concrete founded on steel piling.
Span: 58' Completed: 1997

The project involved a study, design and plans for the replacement of a section of roadway containing a washed out bridge. The plans included roadway & bridge designs, storm drainage, scour analysis, maintenance of traffic scheme, utility relocations, and traffic control devices. Three bridge superstructure alternatives (steel, concrete, and box culvert) were evaluated, along with alternate abutments types and span configurations.


Ronda Bridge

Over Cabin Creek
Kanawha County, WV

Superstructure: adjacent box beam
Substructure: concrete founded on steel piling.
Span:100' Completed: 1998

Project involved plans for widening the existing roadway approach with alignment adjustments, replacing a deficient bridge, storm drainage, scour analysis, traffic control devices, and utility relocations.


Dog Run Bridge

County Route 15
Over Dog Run
Clay County, WV

Superstructure: Box beam
Substructure: concrete founded on steel piling
Span: 48' Completed: 1997

Plans for widening of the existing roadway approach with alignment adjustments, while replacing a deficient bridge. Project involved: roadway design, storm drainage, scour analysis, traffic control devices, maintenance of traffic scheme, utility relocations, and a simple span prestressed concrete box beam stream crossing.